CASE STUDY | REFURBISHMENT

Brentside High School

We were tasked with the refurbishment of the boys, girls and disabled WC’s and kitchen and washroom areas, in readiness for a new school semester.

Duration

5 Weeks

Value

£72K

Location

Ealing, London

THE BRIEF

To refurbish the boys, girls and disabled WC’s and the kitchen washroom with a changing bench.

PROJECT DELIVERABLES

  • Strip Out
  • Mechanical services
  • Electrical services
  • Wall finishes
  • Floor finishes
  • Ceiling finishes
  • Fittings, furnishing and equipment
  • Installation of safety backed mirrors
  • Installation of new sink troughs
  • Installation of new WC basins

KEY CHALLENGES

Due to the ongoing Covid-19 pandemic, we worked closely with the client to ensure government guidelines were adhered to at all times.

Timing and efficiency were critical in all phases of the project. Due to the works taking place in a school, we were challenged with a quick turnaround during the summer holidays to ensure all works were complete in time for the start of the new school year.

With limited O&M information from previous contractors, our design team had to work hard to ensure the new products colour matched with the existing refurbished toilet areas, to ensure all
areas were uniform.